特级小箩利无码毛片_色偷偷88888欧美精品久久久_国产精品理论片在线观看_学生妹av

濟南蓬發建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關信息發布和相關資訊,敬請關注!
新聞
聯系我們
咨詢電話
15866735826

聯系:張經理

手機: 15866735826

郵箱: 394441862@qq.com

網址://haonin.cn/

地(di)址:山東省濟(ji)南市章丘圣井工(gong)業園

當前位置: 首頁 > 新聞中心 > 公司新聞

鋼筋加工棚搭建要注意什么?

來源://haonin.cn/   發布時間:2024-01-08

鋼筋加(jia)工(gong)棚(peng)主(zhu)要用于(yu)路途、修建、橋梁(liang)工(gong)地施(shi)工(gong)上,一聽名字(zi)就知道是用于(yu)鋼筋加(jia)工(gong)零件所(suo)建的(de)一個防護棚(peng),能夠(gou)用來遮雨避陽(yang),使工(gong)人在氣候(hou)條件不允(yun)許的(de)情(qing)況下進行(xing)作業生產(chan)。

The steel bar processing shed is mainly used for road, construction, and bridge construction sites. The name suggests that it is a protective shed built for steel bar processing parts, which can be used to shelter from rain and sunlight, allowing workers to carry out work and production in weather conditions that do not allow.

鋼(gang)筋加工(gong)(gong)棚(peng)常(chang)用(yong)的(de)尺度(du)(du)有兩種(zhong),一(yi)種(zhong)是(shi)寬(kuan)4000*長(chang)6000*高3500㎜,另一(yi)種(zhong)是(shi)寬(kuan)6000*長(chang)9000*高3500mm,鋼(gang)筋加工(gong)(gong)棚(peng)的(de)結構(gou)分為立柱(zhu)、橫(heng)梁(liang)、雙層龍骨,氟(fu)碳涂層彩鋼(gang)板(ban)(ban),防(fang)砸(za)木板(ban)(ban)5大類(lei),這些大類(lei)拼裝(zhuang)出一(yi)整套(tao)的(de)鋼(gang)筋加工(gong)(gong)棚(peng),連接(jie)方法(fa)。運用(yong)鍍鋅緊固件,按照圖紙量好(hao)場所尺度(du)(du)后(hou)(hou)先垂(chui)立立柱(zhu),立柱(zhu)設備(bei)(bei)(bei)結束(shu)后(hou)(hou)在(zai)立柱(zhu)前端(duan)設備(bei)(bei)(bei)橫(heng)梁(liang),等設備(bei)(bei)(bei)好(hao)橫(heng)梁(liang)后(hou)(hou)依(yi)據圖紙量好(hao)龍骨尺度(du)(du)散布設備(bei)(bei)(bei),這一(yi)步完成后(hou)(hou)直接(jie)設備(bei)(bei)(bei)防(fang)砸(za)模板(ban)(ban),終究(jiu)一(yi)步便是(shi)氟(fu)碳涂層彩鋼(gang)板(ban)(ban)的(de)設備(bei)(bei)(bei)。

There are two commonly used dimensions for steel bar processing sheds. One is 4000 mm wide * 6000 mm long * 3500mm high, and the other is 6000 mm wide * 9000 mm long * 3500mm high. The structure of the steel bar processing shed is divided into five categories: columns, crossbeams, double-layer keels, fluorocarbon coated color steel plates, and anti impact wooden boards. These categories assemble a complete set of steel bar processing sheds and their connection methods. Using galvanized fasteners, after measuring the site scale according to the drawing, the column is first erected. After the column equipment is completed, the crossbeam is installed at the front end of the column. After the crossbeam is installed, the keel scale is measured according to the drawing to spread the equipment. After this step is completed, the anti smashing template is directly installed, and the final step is to use fluorocarbon coated color steel plate equipment.

看似(si)設備麻煩,實則(ze)設備簡略,運送便(bian)利,是(shi)工(gong)地鋼(gang)(gang)筋(jin)(jin)防(fang)護棚的(de)(de)挑選,鋼(gang)(gang)筋(jin)(jin)加(jia)工(gong)棚和鋼(gang)(gang)管防(fang)護棚的(de)(de)比照:鋼(gang)(gang)筋(jin)(jin)加(jia)工(gong)棚符合出產標(biao)準化要求,定型組裝和設備,配(pei)色,結(jie)構,可(ke)達到標(biao)準化要求。

Although the equipment may seem complicated, in reality, it is simple and easy to transport. It is the selection of steel reinforcement protection sheds for construction sites. The comparison between steel reinforcement processing sheds and steel pipe protection sheds: the steel reinforcement processing shed meets the standardized requirements for safe production, with standardized assembly and equipment, color matching, and structural safety, which can meet the standardized requirements.

鋼筋(jin)加工(gong)棚(peng)選(xuan)用(yong)規范不(bu)銹(xiu)鋼板材制做,兩層防墜(zhui)構造,結(jie)實用(yong),規范化設計方案,全組裝式,快(kuai)組裝,拆裝簡易(yi),運送(song)。伴隨著市(shi)場(chang)經濟(ji)體(ti)制的(de)發展趨勢(shi),修(xiu)建工(gong)程施工(gong)公司遭遇著強(qiang)烈的(de)市(shi)場(chang)需求。怎(zen)樣(yang)打造出平(ping)穩(wen),美觀大方的(de)文明行為施工(gong)工(gong)地(di)是各個施工(gong)工(gong)地(di)需要應對的(de)難點,施工(gong)工(gong)地(di)鋼筋(jin)加工(gong)棚(peng)是修(xiu)建工(gong)程施工(gong)平(ping)穩(wen)管理方法(fa)為要害的(de)一環。

20220330052444906.jpg

The steel processing shed is made of standard stainless steel plates, with a two-layer anti fall structure, practical structure, standardized design scheme, fully assembled, fast assembly, easy disassembly and transportation. With the development trend of the market economy system, construction companies are facing strong market demand. How to create a stable, aesthetically pleasing and civilized construction site is a difficult point that each construction site needs to deal with. The steel processing shed on the construction site is a crucial part of the smooth management method for construction projects.

鋼筋加(jia)工棚應怎樣設置?

How to set up a steel processing shed?

1、各種防護棚應該有單的模(mo)板(ban)支撐體系,固定不(bu)動平(ping)穩。制止用竹子(zi)(zi)搭設,且(qie)不(bu)行懸挑腳手架在(zai)外面(mian)架子(zi)(zi)上;

1. Various protective sheds should have a single template support system that is fixed and stable. Prohibit the use of bamboo for construction, and do not hang scaffolding on external shelves;

2、收支(zhi)房屋修建行為(wei)(wei)(wei)(wei)主體通道口(kou)應(ying)搭設防(fang)護棚(peng)。棚(peng)寬闊于(yu)道閘,兩邊(bian)各長出(chu)1m,凈寬規格應(ying)合乎高(gao)(gao)空(kong)作業平(ping)穩(wen)防(fang)護區域。掉落(luo)半徑(R)各自為(wei)(wei)(wei)(wei):當下跌(die)物(wu)高(gao)(gao)度(du)為(wei)(wei)(wei)(wei)2~5m時,R為(wei)(wei)(wei)(wei)3m;當下跌(die)物(wu)高(gao)(gao)度(du)為(wei)(wei)(wei)(wei)5~15m時,R為(wei)(wei)(wei)(wei)4m;當下跌(die)物(wu)高(gao)(gao)度(du)為(wei)(wei)(wei)(wei)15~30m時,R為(wei)(wei)(wei)(wei)5m;當下跌(die)物(wu)高(gao)(gao)度(du)超(chao)過30m時,R為(wei)(wei)(wei)(wei)6m;

2. The main body of the income and expenditure housing construction behavior should set up protective sheds at the safety passage entrance. The shed is wider than the gate, with a length of 1m on each side. The net width specification should comply with the safe and stable protection area for high-altitude operations. The falling radii (R) are: when the height of the falling object is 2-5m, R is 3m; When the height of the falling object is 5-15m, R is 4m; When the height of the falling object is 15-30m, R is 5m; When the height of the falling object exceeds 30m, R is 6m;

3、木(mu)匠加工場所(suo)、修建鋼筋加工場所(suo)等上(shang)邊有可能下跌(die)物品或處(chu)在起重設備調桿旋轉(zhuan)區域以內,應(ying)搭設兩層防護棚;

3. Two layers of protective sheds should be erected on carpenter processing sites, steel reinforcement processing sites, and other areas where objects may fall or are within the rotating area of lifting equipment adjustment rods;

4、非通道口應(ying)設(she)定禁行標志,制(zhi)止收支。

4. Non safe passage entrances should be marked with no traffic signs to prevent income and expenditure.

5、平穩防護(hu)棚(peng)應選(xuan)用(yong)兩層保護(hu)措施,當選(xuan)用(yong)腳板口(kou)腔(qiang)上皮(pi)細胞,層間隔600mm,鋪裝方位應相(xiang)互垂(chui)直(zhi);

5. A stable protective shed should be equipped with two layers of protective measures. When using foot board oral epithelial cells, the layer spacing should be 600mm, and the paving direction should be perpendicular to each other;

6、內(nei)場(外)路面邊(bian)框線與(yu)房屋(wu)修(xiu)建(jian)(或(huo)外腳手架)邊(bian)緣間距各(ge)自低(di)于掉落(luo)半徑的,應搭(da)設平穩通道(dao)。

6. If the distance between the boundary line of the inner (outer) road surface and the edge of the building construction (or outer scaffolding) is lower than the falling radius, a stable and safe passage should be erected.